July 31, 2025

7.284 | Tubed Map # 93

Glenwood Guard House, Schematic Design, Details.
July 31, 2025

7.285 | Tubed Map # 128

Dillon Kyle Arch. Plans of maintenance shop (Not for Construction).
July 31, 2025

7.286 | Tubed Map # 174

New Visitors Center & Administrative Building(revised pricing set).
July 31, 2025

7.287 | Tubed Map #70

Terra Survey of Glenwood Cemetery sections Forest Mound, H-3, and Lakeview.
July 31, 2025

7.288 | Tubed Map #60

William Dunwoody Family- Memorial Estimate.
July 31, 2025

7.289 | Terra Survey, Proposed Smith Lot

Exhibit A.
July 31, 2025

7.290– | Tubed Map # 165

Pelli Architects Block 58, Tree removal plan package. Project # 17034.
July 31, 2025

7.271 | Tubed Map #247

Project #GWCs601.
July 31, 2025

7.272 | Tubed Map #248

Scale- 1"=20'. Project #GWCs601.
July 31, 2025

7.273 | Visitor Center Plans

Project: GWCs601.
July 31, 2025

7.274 | Tubed Map # 176

New Visitors Center & Administrative Building.
July 31, 2025

7.275 | Tubed Map # 85

Overall Square Footage maps.
July 31, 2025

7.276 | Tubed Map # 175

New Visitors Center & Building Layout.
July 31, 2025

7.277 | Tubed Map # 94

Glenwood Guard House, Schematic Design, Details.
July 31, 2025

7.278 | Tubed Map # 181

1995 Aerial photograph of Washington Cemetery, Scale 1"=80'.
July 31, 2025

7.279 | Tubed Map # 129

Plans of Glenwood Cemetery maintenance facilities by Dillon Kyle Architects.
July 31, 2025

7.280– | Tubed Map # 146

Survey completed by George Collison for Skyline Meadow.
July 31, 2025

7.261 | Tubed Map # 116

Swa Group Lake package, Graph Sheet 1-7.
July 31, 2025

7.262 | Tubed Map #65

Glenwood Cemetery map of section F-3.
July 31, 2025

7.263 | Tubed Map # 122

Glenwood Cemetery maps of four different sections.
July 31, 2025

7.264 | Tubed Survey #6

Partial topographic survey of Glenwood Cemetery, updated topography.
July 31, 2025

7.265 | Tubed Map # 88

Historical maps for Houston's Silent Garden Book, Email.
July 31, 2025

7.266 | Stewart Family Plot Plans #249

Macdougal-Steele.
July 31, 2025

7.267 | Tubed Map # 177

First and Second Floor Site Plan.
July 31, 2025

7.268 | Tubed Map # 142

Residence relocation & Drainage Plan by Curtis Dumas Engineering.
July 31, 2025

7.269 | Tubed Map # 84

Glenwood Cemetery Maps of overall square footage
July 31, 2025

7.270– | Tubed Map # 127

Dillon Kyle schematic design of maintenance facilities.
July 31, 2025

7.251 | Section Map

Reserve C construction documents, Road Slope Stabilization, GWC.
July 31, 2025

7.252 | Tubed Map #66

SWA Group Reserve C Package #1 Road/Slope Stabilization issue for Construction.
July 31, 2025

7.253 | Tubed Map #64

Howe- Sullivan drainage plan/wall for Glenwood Cemetery.
July 31, 2025

7.254 | Tubed Map # 171

Controller- 5(E), Washington Cemetery Section I, Utility Locations.
July 31, 2025

7.255 | Tubed Map # 170

Controller- 4(D), Guard House, Utility Locations.
July 31, 2025

7.256 | Tubed Map # 169

Controller- 3(C), Office, Utility Locations.
July 31, 2025

7.257 | Tubed Map # 172

Overall map of Glenwood & Washington Cemetery, Utility Locations.
July 31, 2025

7.258 | Tubed Map # 167

Controller- 1(A), K Fence, Utility locations.
July 31, 2025

7.259 | Tubed Map #19

Wall Calendar, Zero recorded injuries.
Font Resize