Master Plan for Erosion Control and Character Sections
5 maps- Schematic Illustrative Plan- Erosion Control Area GWC. Master Plan Option B. Master Plan Option B with Catering Property. Master Plan Option B with Falcon Property. Glenwood Cemetery Character Sections (2).
July-- 2006
5.072
Schematic Illustrative Plan- Erosion Control Area GWC
Schematic Illustrative Plan.
July-- 2006
5.073
GWC Stream Garden, Phase 1 Site Development
Stream Garden Phase 1 Site Development
August 08/ 2006
5.074
Photo of Gully for Erosion Project
Part of the Erosion Control Project.
August 14/ 2006
5.075
Terrace Contract for FCW
Exhibit A. Exhibit B- Book Committee Report to Board of Directors of GWC, Inc.
September 11/ 2006
5.076
Section Map
Beam installation in Stream Garden
October 23/ 2006
5.077
Project Manuel (2)
Stream Garden Phase 1 Site Development
October 23/ 2006
5.078
Master Plan Report
Glenwood Cemetery, Inc.
October 25/ 2006
5.079
Certificate
Certificate of Corporate Resolution
November 22/ 2006
5.08
Hand Drawn Map
Hand drawn Map
January 22/ 2007
5.041
Fountain Painting Memorandum
Paint Procedure for your Fountain.
March 30/ 1995
5.042
Engineering Study
Engineering Study for existing fill placed in a Special Flood Hazard Area(Glenwood Cemetery)
April 06/ 1995
5.043
Section Map
Glenwood Cemetery
April 12/ 1995
5.044
Memorandum
Glenwood Cemetery Master Plan
July 12/ 1995
5.045
Section Map
Glenwood Cemetery Sec. West Ave. Map
July 14/ 1995
5.046
Section Map
Glenwood Cemetery Section K
August 23/ 1995
5.047
Section Map
Glenwood Cemetery Section G-3
September 25/ 1995
5.048
Land Reclamation Feasibility & Illustrative Surveys
Exhibit A, B, C
March 18/ 1997
5.049
P.E. Serial No. 48434
Civil Site Layout, C1.0
March 23 /1998
5.05
Property Description
Property Description
April 06/ 1998
5.051
Inventory List
None.
May 03/ 1999
5.052
Closure of Underground Storage Tank System
Closure of Underground Storage Tank System.
February 15/ 2002
5.053
GWC Columbarium Wall Drawings and Budget
Two drawing sketches of potential Columbarium Wall
January 21/ 2004
5.054
Subsidence District approved permits for GWC
Approved permits.
July 14/ 2004
5.055
Master Plan Proposals- SASAKI and SWA
Glenwood Cemetery Landscape Master Plan
July 20/ 2004
5.056
Carter & Burgess, Slope Stabilization GWC
Project Number: 030737.001
2004- 2005
5.057
Letter to SWA on concise outline and Scope of Master Plan
None.
February 01/ 2005
5.058
Buffalo Bayou Trail from Shepherd
Parcel: AY3-559. C.I.P.:N-0420-18-2
March 28/ 2005
5.059
Erosion Control- Adjacent Property Owners
Part of the Erosion Control Project.
May 16/ 2005
5.06
Erosion Control, Drafts to Adjacent Property Owners